Home | Help | View cart | Login |
Gallery » David and Janet Elmore » Events » 2010-09 Building the Sunroom/Basement Addition
2009-10 Homecoming in West Lafayette 2010-09 Building the Sunroom/Basement Addition
2011-11 Filling up the firewood shelter 2011-12 Christmas

2010-09 Building the Sunroom/Basement Addition

This addition to our Timberpeg timber-frame home was built starting August 2010. Note that some of the images have titles and captions. You will see the captions in large view or during the slideshow.

Date: 29-Sep-10
Size: 198 photos

Album thumbnails have a stacked-look (light border and three lines below them). Click album thumb to see its contents, click photo thumb to see it large, click large photo to see next one, click "View slideshow" to play all photos in the current album.

Expand | Collapse

Before

Before

Date: 17-Apr-10
Views: 5726

Before

Before

Date: 27-Apr-10
Views: 3269

Before

Before

Date: 27-Apr-10
Views: 3150

Before

Before

Date: 27-Apr-10
Views: 3296

Before

Before

Date: 27-Apr-10
Views: 3338

Cutting trees

Cutting trees

Date: 09-Aug-10
Views: 6800

How to do it

How to do it

Date: 09-Aug-10
Views: 3422

Park the saw

Park the saw

Date: 09-Aug-10
Views: 3603

Toss

Toss

Date: 09-Aug-10
Views: 3645

There it goes

There it goes

Date: 09-Aug-10
Views: 3872

It didn't hit the BBQ

It didn't hit the BBQ

Date: 09-Aug-10
Views: 3678

Almost done

Almost done

Date: 09-Aug-10
Views: 3705

Not much left

Not much left

Date: 09-Aug-10
Views: 3658

Tree number 2

Tree number 2

Date: 09-Aug-10
Views: 3711

Cutting branches

Cutting branches

Date: 09-Aug-10
Views: 3888

Long ways up

Long ways up

Date: 09-Aug-10
Views: 3608

4 to pull

4 to pull

Date: 09-Aug-10
Views: 3576

Cutting the wedge

Cutting the wedge

Date: 09-Aug-10
Views: 3793

Timber!

Timber!

Date: 09-Aug-10
Views: 3645

Thump!

Thump!

Date: 09-Aug-10
Views: 3686

Cutting off the base

Cutting off the base

Date: 09-Aug-10
Views: 3702

Marking for excavation

Marking for excavation

Date: 31-Aug-10
Views: 3831

All ready to dig

All ready to dig

Date: 31-Aug-10
Views: 3788

Remove the stumps first

Remove the stumps first

Date: 31-Aug-10
Views: 3506

DE10083713

DE10083713

Date: 31-Aug-10
Views: 3420

Digging the hole

Digging the hole

Date: 31-Aug-10
Views: 3417

Pile gets bigger

Pile gets bigger

Date: 31-Aug-10
Views: 3344

Almost done

Almost done

Date: 31-Aug-10
Views: 3513

All done

All done

Date: 31-Aug-10
Views: 3473

DE10083727

DE10083727

Date: 31-Aug-10
Views: 3405

Ready for the footer

Ready for the footer

Date: 31-Aug-10
Views: 3768

Under the deck

Under the deck

Date: 31-Aug-10
Views: 3457

Form for footer

Form for footer

Date: 06-Sep-10
Views: 3505

Footers

Footers

Date: 06-Sep-10
Views: 3587

Ready to pour

Ready to pour

Date: 06-Sep-10
Views: 3420

New entrance

New entrance

Date: 06-Sep-10
Views: 3636

Shooting pea gravel

Shooting pea gravel

Date: 07-Sep-10
Views: 3461

Dump truck

Dump truck

Date: 07-Sep-10
Views: 3353

Remote control

Remote control

Date: 07-Sep-10
Views: 3454

All done

All done

Date: 07-Sep-10
Views: 3245

Pouring the footer

Pouring the footer

Date: 07-Sep-10
Views: 3303

Pouring the footer

Pouring the footer

Date: 07-Sep-10
Views: 3273

Pouring the footer

Pouring the footer

Date: 07-Sep-10
Views: 3458

Pouring the footer

Pouring the footer

Date: 07-Sep-10
Views: 3278

Well-used road

Well-used road

Date: 07-Sep-10
Views: 3538

Finished footers

Finished footers

Date: 07-Sep-10
Views: 3628

Plans and permit

Plans and permit

Date: 07-Sep-10
Views: 3514

Starting wall forms

Starting wall forms

Date: 08-Sep-10
Views: 3809

Wall forms almost done

Wall forms almost done

Date: 08-Sep-10
Views: 3445

Wall forms

Wall forms

Date: 08-Sep-10
Views: 3563

Window openings

Window openings

Date: 09-Sep-10
Views: 3535

Finishing openings

Finishing openings

Date: 09-Sep-10
Views: 3568

Pump truck arrives

Pump truck arrives

Date: 09-Sep-10
Views: 3887

Pump truck

Pump truck

Date: 09-Sep-10
Views: 3813

Workings of pump truck

Workings of pump truck

Date: 09-Sep-10
Views: 3474

Cement truck ready to go

Cement truck ready to go

Date: 09-Sep-10
Views: 3402

Starting the pour

Starting the pour

Date: 09-Sep-10
Views: 3583

Mario

Mario

Date: 09-Sep-10
Views: 3510

Pumping away

Pumping away

Date: 09-Sep-10
Views: 3681

Pumping cement

Pumping cement

Date: 09-Sep-10
Views: 3650

Stirring the cement

Stirring the cement

Date: 09-Sep-10
Views: 3430

Pumping cement

Pumping cement

Date: 09-Sep-10
Views: 3631

More

More

Date: 09-Sep-10
Views: 3529

Pump truck

Pump truck

Date: 09-Sep-10
Views: 3812

Fill er up

Fill er up

Date: 09-Sep-10
Views: 4114

More stirring

More stirring

Date: 09-Sep-10
Views: 3518

Waiting

Waiting

Date: 09-Sep-10
Views: 3832

Final round

Final round

Date: 09-Sep-10
Views: 3895

Smoothing the top

Smoothing the top

Date: 09-Sep-10
Views: 3821

All done

All done

Date: 09-Sep-10
Views: 3690

Missing the branches

Missing the branches

Date: 09-Sep-10
Views: 3636

Leveling

Leveling

Date: 09-Sep-10
Views: 3418

Cleaning the pump truck

Cleaning the pump truck

Date: 09-Sep-10
Views: 3316

Smoothing the top

Smoothing the top

Date: 09-Sep-10
Views: 4015

Done for the day

Done for the day

Date: 09-Sep-10
Views: 3626

Forms removed

Forms removed

Date: 10-Sep-10
Views: 3591

Water proofing

Water proofing

Date: 10-Sep-10
Views: 3546

Finished wall

Finished wall

Date: 10-Sep-10
Views: 3551

Inside

Inside

Date: 10-Sep-10
Views: 3363

Nice wall

Nice wall

Date: 10-Sep-10
Views: 3373

Starting to look like something

Starting to look like...

Date: 10-Sep-10
Views: 3364

More drain tile

More drain tile

Date: 13-Sep-10
Views: 3303

Drain tile

Drain tile

Date: 13-Sep-10
Views: 3365

Exit pipe

Exit pipe

Date: 13-Sep-10
Views: 3349

Ready to pour floors

Ready to pour floors

Date: 17-Sep-10
Views: 3417

Form for entry slab

Form for entry slab

Date: 17-Sep-10
Views: 3313

Starting the pour

Starting the pour

Date: 17-Sep-10
Views: 3497

Hard work

Hard work

Date: 17-Sep-10
Views: 3747

Pouring the floor

Pouring the floor

Date: 17-Sep-10
Views: 3542

Leveling

Leveling

Date: 17-Sep-10
Views: 3264

More

More

Date: 17-Sep-10
Views: 3282

Working across

Working across

Date: 17-Sep-10
Views: 3198

Leveling

Leveling

Date: 17-Sep-10
Views: 3308

Work around plumbing

Work around plumbing

Date: 17-Sep-10
Views: 3315

Floater

Floater

Date: 17-Sep-10
Views: 3308

Porch slab

Porch slab

Date: 17-Sep-10
Views: 3321

Power leveler/smoother

Power leveler/smoother

Date: 17-Sep-10
Views: 3513

Shines up surface

Shines up surface

Date: 17-Sep-10
Views: 3234

Drain cover

Drain cover

Date: 17-Sep-10
Views: 3235

Pea gravel almost gone

Pea gravel almost gone

Date: 17-Sep-10
Views: 3206

Tractor after some backfill

Tractor after some backfill

Date: 17-Sep-10
Views: 3310

Backfill on exit pipes

Backfill on exit pipes

Date: 17-Sep-10
Views: 3136

Under deck

Under deck

Date: 17-Sep-10
Views: 3344

More backfill

More backfill

Date: 18-Sep-10
Views: 3192

More backfill

More backfill

Date: 18-Sep-10
Views: 3167

Under deck

Under deck

Date: 18-Sep-10
Views: 3398

More backfill

More backfill

Date: 18-Sep-10
Views: 3286

Inside with new floor

Inside with new floor

Date: 18-Sep-10
Views: 3296

Busy day for tractor

Busy day for tractor

Date: 18-Sep-10
Views: 3088

Top view

Top view

Date: 21-Sep-10
Views: 3313

House trim removed

House trim removed

Date: 21-Sep-10
Views: 3446

Stone wall

Stone wall

Date: 21-Sep-10
Views: 3654

Deck support

Deck support

Date: 21-Sep-10
Views: 3475

Sunroom floor installation

Sunroom floor installation

Date: 22-Sep-10
Views: 3669

Starting floor plywood

Starting floor plywood

Date: 22-Sep-10
Views: 3608

Floor plywood

Floor plywood

Date: 22-Sep-10
Views: 4077

Lots of screws

Lots of screws

Date: 22-Sep-10
Views: 3609

Window out

Window out

Date: 23-Sep-10
Views: 3649

Window out

Window out

Date: 23-Sep-10
Views: 3699

Concrete surgery

Concrete surgery

Date: 23-Sep-10
Views: 3688

Concrete surgery

Concrete surgery

Date: 23-Sep-10
Views: 3805

Concrete surgery

Concrete surgery

Date: 23-Sep-10
Views: 3676

Hydraulic pump

Hydraulic pump

Date: 23-Sep-10
Views: 3873

Vertical cut

Vertical cut

Date: 23-Sep-10
Views: 3691

Concrete surgery

Concrete surgery

Date: 23-Sep-10
Views: 3886

Concrete surgery

Concrete surgery

Date: 23-Sep-10
Views: 3869

Chain saw

Chain saw

Date: 23-Sep-10
Views: 3757

Chain saw

Chain saw

Date: 23-Sep-10
Views: 3601

Removing the blocks

Removing the blocks

Date: 23-Sep-10
Views: 3663

Tractor tow

Tractor tow

Date: 23-Sep-10
Views: 3786

Open doorway!

Open doorway!

Date: 23-Sep-10
Views: 3767

Open doorway!

Open doorway!

Date: 23-Sep-10
Views: 3573

Moved block

Moved block

Date: 23-Sep-10
Views: 3567

Four seasons glass arrives!

Four seasons glass arrives!

Date: 24-Sep-10
Views: 3622

Plywood ready to go

Plywood ready to go

Date: 24-Sep-10
Views: 3860

Progress on the walls

Progress on the walls

Date: 24-Sep-10
Views: 3827

Front view progress

Front view progress

Date: 24-Sep-10
Views: 3668

Glass parts

Glass parts

Date: 24-Sep-10
Views: 3793

Almost finished floor deck

Almost finished floor deck

Date: 27-Sep-10
Views: 3863

Windows installed

Windows installed

Date: 27-Sep-10
Views: 3551

Door installed

Door installed

Date: 27-Sep-10
Views: 4018

New furnace

New furnace

Date: 28-Sep-10
Views: 3894

Wall moved

Wall moved

Date: 28-Sep-10
Views: 3749

Old furnace going out

Old furnace going out

Date: 28-Sep-10
Views: 3490

Space for new furnace.

Space for new furnace.

Date: 28-Sep-10
Views: 3610

Old goes by the new

Old goes by the new

Date: 28-Sep-10
Views: 3569

Learning about the new furnace

Learning about the new furnace

Date: 28-Sep-10
Views: 3598

New furnace in place

New furnace in place

Date: 28-Sep-10
Views: 3583

New ducting

New ducting

Date: 28-Sep-10
Views: 3744

All done

All done

Date: 28-Sep-10
Views: 3733

Furnace nameplate.

Furnace nameplate.

Date: 28-Sep-10
Views: 4495

Starting the sunroom

Starting the sunroom

Date: 08-Oct-10
Views: 3578

Sliding door to deck

Sliding door to deck

Date: 08-Oct-10
Views: 3538

Glass goes up fast

Glass goes up fast

Date: 08-Oct-10
Views: 3592

Hard at work

Hard at work

Date: 08-Oct-10
Views: 3739

Glass stacked up

Glass stacked up

Date: 08-Oct-10
Views: 3771

Wall frame completed

Wall frame completed

Date: 10-Oct-10
Views: 3795

Window is for sale

Window is for sale

Date: 10-Oct-10
Views: 3558

Inside the sunroom

Inside the sunroom

Date: 10-Oct-10
Views: 3627

Look towards the deck

Look towards the deck

Date: 10-Oct-10
Views: 3577

Stucco on side wall

Stucco on side wall

Date: 10-Oct-10
Views: 3925

Front view

Front view

Date: 10-Oct-10
Views: 3633

Bathroom framed

Bathroom framed

Date: 10-Oct-10
Views: 3754

Bathroom view from print shop

Bathroom view from print shop

Date: 10-Oct-10
Views: 3700

Door is oak 4-panel

Door is oak 4-panel

Date: 10-Oct-10
Views: 3660

Vanity

Vanity

Date: 10-Oct-10
Views: 3715

Shower

Shower

Date: 10-Oct-10
Views: 4084

Rafters in place

Rafters in place

Date: 16-Oct-10
Views: 3717

Almost ready for roof glass

Almost ready for roof glass

Date: 16-Oct-10
Views: 3758

Sunset through the glass

Sunset through the glass

Date: 29-Oct-10
Views: 3837

Removing the dining room window

Removing the dining room...

Date: 31-Oct-10
Views: 4786

One beam gone

One beam gone

Date: 31-Oct-10
Views: 3750

Second beam out

Second beam out

Date: 31-Oct-10
Views: 3925

Door installed and ready for trim

Door installed and ready...

Date: 31-Oct-10
Views: 3638

Andersen insulated door

Andersen insulated door

Date: 31-Oct-10
Views: 5069

Rob cleans roof

Rob cleans roof

Date: 02-Nov-10
Views: 4966

Can walk anywhere

Can walk anywhere

Date: 02-Nov-10
Views: 5068

Sunroom complete

Sunroom complete

Date: 02-Nov-10
Views: 5068

Ready for drywall

Ready for drywall

Date: 02-Nov-10
Views: 5084

Studs nailed to wall

Studs nailed to wall

Date: 02-Nov-10
Views: 4897

Bathroom

Bathroom

Date: 02-Nov-10
Views: 5111

Bathroom wall

Bathroom wall

Date: 03-Nov-10
Views: 5183

Plumbing is roughed in

Plumbing is roughed in

Date: 03-Nov-10
Views: 5206

View from deck

View from deck

Date: 03-Nov-10
Views: 5147

Lots of sunshine

Lots of sunshine

Date: 03-Nov-10
Views: 5073

Needs a tile floor

Needs a tile floor

Date: 03-Nov-10
Views: 4261

Cedar trim installed

Cedar trim installed

Date: 03-Nov-10
Views: 4997

Pine trim inside

Pine trim inside

Date: 03-Nov-10
Views: 5150

Drywall

Drywall

Date: 03-Nov-10
Views: 4996

Up in a few hours

Up in a few hours

Date: 03-Nov-10
Views: 5291

Grass is up

Grass is up

Date: 03-Nov-10
Views: 5126

Street view

Street view

Date: 03-Nov-10
Views: 4293

Front view

Front view

Date: 03-Nov-10
Views: 5105

Stilts make it easy

Stilts make it easy

Date: 03-Nov-10
Views: 4726

Sunset

Sunset

Date: 03-Nov-10
Views: 4140

Fox dining room table

Fox dining room table

Date: 03-Nov-10
Views: 4150

Drywall ready for taping

Drywall ready for taping

Date: 03-Nov-10
Views: 4949

Lots of space

Lots of space

Date: 03-Nov-10
Views: 9966

 
REDIpix.com
Affordable museum-quality Gallery wrap canvas and Fine art prints from these galleries or from your own photos and art. To purchase prints, first add them to your cart then view cart for further instructions.
Copyright 2007 Elmore Photography